PRL Motorsports 2020+ Toyota Supra A90 MKV Charge Pipe Upgrade Kit

Status
Not open for further replies.

PRL Motorsports

Active Member
Joined
May 15, 2019
Threads
8
Messages
31
Reaction score
38
Location
Pittsburgh, Pennsylvania
Car(s)
MKV Supra, FK8 Civic Type-R, FC3 Civic Si
Over the years BMW’s plastic charge tubing have become known for failure due to age and excessive heat. Our Charge Pipe Upgrade Kit is designed to replace the problematic factory unit with our direct bolt-on, 1-piece upgrade. This kit utilizes 3.00” OD .065” wall aluminum tubing, a billet compressor outlet flange and a 4-ply silicone hose connector for optimal airflow and strength. The inlet flange transitions from the factory 48mm compressor outlet to 56mm over a 10mm span, which reduces a step, then smoothly tapers the 73mm ID of the 3.00” tubing. Kits will come standard with an integrated methanol injection bung and sleek sensor billet flange location. The location for methanol bung has yet to be determined and is not shown in the rendering.

No tune required!

Charge Pipe Inlet ID
  • OEM 52mm
  • PRL 56mm
Charge Pipe Outlet ID
  • OEM 65mm
  • PRL 73mm
Product Link:
https://prlmotorsports.com/2020ToyotaSupraChargePipe.aspx

Charge%20Pipe%20With%20Turbo%20Assembly%20LOGO_zpsaxob6hsy.png


Charge%20Pipe%20Flange%20Side%20LOGO_zpsdhhkiwl2.png


Front%20Engine%20Intake%20and%20Charge%20Pipe%20Assembly%202%20LOGO_zpsuwuo0trl.png


Bottom%20Front%20Engine%20Intake%20and%20Charge%20Pipe%20Assembly%20LOGO_zpswspkrkyl.png


Passenger%20Head%20Light%20Angle%20Intake%20and%20Charge%20Pipe%20Assembly%20LOGO_zpsvvtdkotv.png
Sponsored

 
Last edited:
OP
OP
PRL Motorsports

PRL Motorsports

Active Member
Joined
May 15, 2019
Threads
8
Messages
31
Reaction score
38
Location
Pittsburgh, Pennsylvania
Car(s)
MKV Supra, FK8 Civic Type-R, FC3 Civic Si
When will this release? I would love to get a charge pipe soon. I wish this can come out before I have to purchase one.
We will have more news in regards to ETAs shortly. Our prototype silicone should be here within the next few weeks to test fitment and approve production.
 
Status
Not open for further replies.
 




Top